The Inspector's report on the Cheltenham, Gloucester and Tewkesbury Joint Local Plan was issued to the Councils on 26 October 2017. The Inspector found that provided modifications were made the plan would proceed to a referendum.
The first Draft Plan was published by Tewkesbury Borough, Cheltenham Borough and Gloucester City Councils for consultation between 15 October 2013 and 26 November 2013.
Tewkesbury Borough, Cheltenham Borough and Gloucester City Councils then published their pre-submission draft Joint Core Strategy for a conciltation that took place between 30 June 2014 and 18 August 2014.
The Councils then submitted the plan for examination on 20 November 2014.