Farm turbine decommissioning condition lifted as unnecessary

An inspector has lifted a condition specifying that an 11kW wind turbine on a Welsh farm must be removed after 25 years, concluding that it probably has a longer operational life.

Inspector: Alwyn Nixon; Written representations