Chalk pit 'restoration' really waste disposal operation

Permission was denied for the restoration of a chalk pit in the Lincolnshire countryside when an inspector decided that the deposit of 80,000 cubic metres of construction waste was not necessary to achieve the proposed conservation after-use of the appeal site and, therefore, amounted to a waste disposal operation.

This content can be viewed only by subscribers. Please sign in below or subscribe for full access

Sign in below

This page provides single sign-on for PlanningResource, DCP Online and COMPASS Online.

Having trouble signing in?

Forgotten password?

Refer to our Frequently Asked Questions. If you still require assistance, please contact Customer Support at

Don't Have an Account?

Most people subscribe by direct debit to save 17%

Or choose our simple credit card option

Not sure yet? Take a free trial to PlanningResource

To discuss corporate subscriptions, call us on 01452 835820.

Planning Subscriber Activation

I subscribe to Planning - activate my subscription

Planning subscription expired? Call 0208 267 8121, or email us to renew